Equipment

Racking Inspection Checklist: Weekly Pallet Racking Checks

Frequency
Weekly
Completed by
Person responsible for racking safety or appointed racking inspector
Approved by
Warehouse manager
The checklist
32 checks · 5 sections

A racking inspection checklist is the regular visual check of pallet racking made from ground level by the person responsible for racking safety or an inspector they appoint: load notices and records, the structure (uprights, bracing, beams, beam locks, base plates and floor fixings), protection and aisles, how loads and pallets sit in the racking, and the action for any damage found. Damage is graded green, amber or red, and a red-risk area is offloaded and isolated at once.

In Great Britain, HSE's guidance HSG76 expects damage to be reported immediately, visual inspections at weekly or other regular intervals set by risk assessment with a written record, and an expert inspection by a technically competent person at intervals of not more than 12 months. In Türkiye, Law 6331 requires the employer to take every measure to prevent occupational risks and to monitor them; ÇSGB's Güvenli İstifleme Rehberi (advisory) recommends weekly and monthly checks by authorised in-house inspectors and, citing TS EN 15635, a yearly check by experts. In the United States, OSHA 29 CFR 1910.176 requires that storage does not create a hazard, that stored material is stable and secure against sliding or collapse, and that aisles are kept clear.

This form does not replace the yearly expert inspection, the manufacturer's damage limits or a design check before the racking is changed. For the rest of the warehouse, see our warehouse and logistics safety checklist.

How to use this checklist

  1. Agree the interval with the person responsible for racking safety: weekly, or another regular interval based on risk assessment, plus a check whenever an impact is reported.
  2. Walk every aisle from ground level with the load notice in hand, and do one form per aisle or block of runs so defects can be traced to a bay.
  3. Look at the lower levels and corner uprights most closely, as most impact damage happens there; ask for an inspection from access equipment if you see signs of a problem higher up.
  4. Grade each defect using the manufacturer's or expert's limits: green is recorded and watched, amber is unloaded and not reloaded until repaired, red is offloaded and isolated at once.
  5. Label isolated locations with the date, report every defect in writing and enter it in the racking log.
  6. Keep the signed form with the expert inspection report so the next inspector can see what changed.

The checklist: Racking Inspection Checklist: Weekly Pallet Racking Checks

Inspection details

Site / warehouse: 
Aisle, runs or bays inspected: 
Racking type: 
Inspection type: 
Date of last expert inspection: 
Date and time: 

Load notices and records

  1. 1.

    Each run has a clear load notice securely fixed to it, showing the maximum load and any required load configuration

    A typical notice gives the maximum load per beam level and per bay, the height to the first beam and the beam pitch.

    Ref.: [1] [3]

    PassFailN/A
  2. 2.

    Beam levels and other adjustable parts match the configuration on the load noticeCritical

    Moving the first or second beam from the bottom is the most critical change and always needs a capacity check and an updated notice.

    Ref.: [1] [3]

    PassFailN/A
  3. 3.

    The last expert inspection was within 12 months and its proposed actions are closed or in progress

    Ref.: [1] [3]

    PassFailN/A
  4. 4.

    Inspections, damage and repairs are recorded in a log, and earlier amber items have been repaired within four weeks

    Under HSG76, amber damage not repaired within four weeks of its designation becomes red.

    Ref.: [1] [2] [3]

    PassFailN/A

Structure (from ground level)

Judge damage against the manufacturer's or the expert inspector's limits. Any damage reduces the racking's load capacity.

  1. 5.

    Uprights are free of dents, bends, twists, splits or other impact damageCritical

    Look hardest at the lower levels and at corner uprights next to aisles and gangways.

    Ref.: [1] [3]

    PassFailN/A
  2. 6.

    Uprights stand vertical and the racking does not leanCritical

    Ref.: [3]

    PassFailN/A
  3. 7.

    Horizontal and diagonal frame bracing is in place, straight and attached at both endsCritical

    Ref.: [1] [3]

    PassFailN/A
  4. 8.

    Beams are not bent, dented or visibly saggingCritical

    Ref.: [1] [3]

    PassFailN/A
  5. 9.

    Beam-to-upright connectors and welds show no cracks or deformationCritical

    Ref.: [3] [1]

    PassFailN/A
  6. 10.

    A beam connector lock is fitted and engaged at each end of every beamCritical

    Locks stop a beam lifting out if a lift truck catches it from below.

    Ref.: [1] [3]

    PassFailN/A
  7. 11.

    Base plates are in place and undamaged, and floor fixings are present and secureCritical

    Free-standing racks should not be used where lift trucks or other handling equipment work.

    Ref.: [1] [3]

    PassFailN/A
  8. 12.

    The floor under the racking is sound and level, with no cracking or settlement at the base plates

    Ref.: [1] [3]

    PassFailN/A
  9. 13.

    Run spacers on back-to-back runs and any wall ties are in place and undamaged

    Ref.: [1]

    PassFailN/A
  10. 14.

    The racking has not been altered (no welding, cutting or drilling) and no components have been removedCritical

    Any change needs the manufacturer's advice first.

    Ref.: [1] [3]

    PassFailN/A

Protection, aisles and access

  1. 15.

    Column guards are fitted where uprights are likely to be struck, and are undamaged

    A damaged guard is replaced; also check the upright behind it.

    Ref.: [1] [3]

    PassFailN/A
  2. 16.

    Corner uprights at the ends of runs have a protective device in a conspicuous colour

    Ref.: [1] [3]

    PassFailN/A
  3. 17.

    Aisles are clear, tidy and wide enough for the handling equipment to manoeuvre

    No stock, pallets or waste left in aisles. OSHA also requires permanent aisles to be marked.

    Ref.: [3] [1] [5]

    PassFailN/A
  4. 18.

    No one climbs the racking, and upper levels are reached only with suitable access equipmentCritical

    Ref.: [1] [2] [3]

    PassFailN/A
  5. 19.

    Safety signs on the racking (for example do not climb, report all damage) are present and legible

    Ref.: [3] [1]

    PassFailN/A
  6. 20.

    Top loads keep the clearance below sprinklers required by the fire protection design

    US: OSHA 1910.159(c)(10) requires at least 18 in (45.7 cm) between sprinklers and the material below.

    Ref.: [6]

    PassFailN/A

Loads and pallets

  1. 21.

    No beam level or bay is loaded above the limits on the load noticeCritical

    The weight of each pallet load should be known before it is stored, especially for new or mixed product lines.

    Ref.: [1] [3]

    PassFailN/A
  2. 22.

    Pallets sit squarely on both beams and loads are spread evenly along each beam

    Ref.: [3] [1]

    PassFailN/A
  3. 23.

    Clearances are kept between adjacent loads, between loads and uprights, and between the top of each load and the beam above

    ÇSGB Table 4.3 (beam height up to 3000 mm): 75 mm each; up to 6000 mm: 75, 75 and 100 mm above the load. Back-to-back loads: at least 100 mm (Table 4.2).

    Ref.: [3]

    PassFailN/A
  4. 24.

    Loads are stable and secured on their pallets, and nothing overhangs into the aisle or is pushed through to the backCritical

    Ref.: [3] [1] [2] [5]

    PassFailN/A
  5. 25.

    Pallets in the racking are in good condition, with no broken boards or bearers

    Ref.: [1] [2] [3]

    PassFailN/A
  6. 26.

    Pallets suit this racking system, and no one-trip (expendable) pallets are stored in it

    Ref.: [1] [2] [3]

    PassFailN/A
  7. 27.

    Pallets are lowered onto the beams and are not slid or pushed along them

    Ref.: [1] [3]

    PassFailN/A

Damage action and result

  1. 28.

    Every damaged component found has been graded green, amber or red

    Green: record and re-examine at later inspections. Amber: repair as soon as possible. Red: immediate action.

    Ref.: [1]

    YesNoN/A
  2. 29.

    Any red-risk area has been offloaded at once and isolated so it cannot be used until repairedCritical

    For example, offload the bay in the inspector's presence and rope it off. Repair is usually by replacing the damaged component.

    Ref.: [1] [2]

    YesNoN/A
  3. 30.

    Amber-risk locations are labelled with the date and are not reloaded once emptied until repairedCritical

    Ref.: [1]

    YesNoN/A
  4. 31.

    Every defect has been reported in writing to the person responsible for racking safety and entered in the log

    Ref.: [1] [3] [4]

    YesNoN/A
  5. 32.

    Notes, defect locations and grades

    Note: ________

Critical check: if it fails, stop and correct it before work continues.

Sign-off

Inspected by

Name: 
Signature: 
Date: 

Person responsible for racking safety

Name: 
Signature: 
Date: 

Run this checklist on your phone

FindRisk turns inspections into a few taps: AI-generated checklists you can edit and save as templates, photo markup with AI hazard analysis, Fine-Kinney risk scoring and an instant PDF report.

Download FindRisk

Legal basis and references

  1. [1] United Kingdom: HSE HSG76: Warehousing and storage – A guide to health and safety (Second edition, 2007) — Para 596 and 655: no climbing on racking; 611, 617: pallet suitability and inspection, expendable pallets; 619: pallets lowered onto beams; 633–634: installation, floor, run spacers, floor fixing, beam connector locks, load notice (Figure 48), no alterations, capacity check when moving beams; 636–638: free-standing racks and floor fixing; 639: column guards and corner uprights; 641–652: damage reduces capacity, PRRS, immediate reporting, weekly or regular visual inspections with a record, expert inspection at intervals of not more than 12 months, log; Table 11: green, amber and red damage and actions.
  2. [2] United Kingdom: HSE INDG412: Warehousing and storage – Keep it safe — Pallets inspected before each use and suited to the racking; racking protected where it may be struck; three types of inspection (immediate reporting, regular visual, expert); offload damaged racking and prevent use until remedied; logbook; no climbing.
  3. [3] Türkiye: ÇSGB İş Sağlığı ve Güvenliği Genel Müdürlüğü, Güvenli İstifleme Rehberi (Revizyon 2024) — Advisory guide. p. 50–51: pallet checks, one-trip pallets; 4.4 (p. 54): load and design marking; 4.4.1.1 (p. 55–56): installation by authorised persons, floor, floor fixing, aisles, beam locks, load plate, no alterations; 4.4.1.2 (p. 57): no climbing, clearances, tidy aisles, damage and repair records; 4.4.1.3 (p. 57–58): immediate reporting, weekly and monthly in-house checks, yearly expert check under TS EN 15635 and the points to check; 4.4.2 (p. 58–59): load sign, upright protectors, even loading, no sliding along beams; 4.4.3 (p. 59–61): clearances, Tables 4.2 and 4.3.
  4. [4] Türkiye: 6331 sayılı İş Sağlığı ve Güvenliği Kanunu (Resmî Gazete, 30.06.2012) — Art. 4(1): the employer takes every measure to prevent occupational risks, monitors and checks that the measures are followed, and carries out a risk assessment.
  5. [5] United States: OSHA 29 CFR 1910.176, Handling materials – general — (a): safe clearances for aisles where mechanical handling equipment is used, aisles kept clear and in good repair, permanent aisles marked; (b): storage shall not create a hazard, stored material stable and secure against sliding or collapse; (c): storage areas free from accumulations that create tripping, fire or explosion hazards.
  6. [6] United States: OSHA 29 CFR 1910.159, Automatic sprinkler systems — (c)(10): minimum vertical clearance of 18 inches (45.7 cm) between sprinklers and the material below.

Version 1 · Updated November 19, 2026 · findrisk.net/checklists/pallet-racking-inspection-checklist/

Frequently asked questions

How often should pallet racking be inspected?

HSE's HSG76 sets three levels: damage reported immediately by any employee, visual inspections at weekly or other regular intervals based on risk assessment with a written record, and an expert inspection by a technically competent person at intervals of not more than 12 months. ÇSGB's Güvenli İstifleme Rehberi recommends weekly and monthly in-house checks and a yearly expert check under TS EN 15635.

What do green, amber and red mean in a racking inspection?

In HSG76 Table 11, green damage needs surveillance only: the component stays in service, recorded and re-examined at later inspections. Amber is hazardous damage needing action as soon as possible: once unloaded the component is not reloaded until repaired, and it becomes red if not repaired within four weeks. Red is very serious damage: the area is offloaded and isolated immediately until repaired, usually by replacing the component.

Who can carry out a racking inspection?

The regular visual inspections are arranged by a nominated person responsible for racking safety (PRRS) under HSG76. The expert inspection is made by a technically competent person, who may be a trained in-house specialist, a specialist from the rack supplier or an independent qualified rack inspector; SEMA runs the SARI scheme for approved rack inspectors.

Does pallet racking have to be bolted to the floor?

HSG76 says free-standing racks should not be used where lift trucks, order pickers or other mechanical handling equipment are used, and gives minimum floor fixing rules based on the height-to-depth ratio. ÇSGB's guide likewise says racking should be firmly fixed to the floor where lifting or handling equipment is used. Drive-in and drive-through racks are fixed as the manufacturer specifies.

Can damaged racking be repaired by welding or straightening?

No. HSG76 and ÇSGB both say racking should never be altered, for example by welding, and components should not be removed without consulting the manufacturer. Red-risk damage is usually repaired by replacing the damaged component, and moving beam levels needs a capacity check and an updated load notice.