Generator Inspection Checklist: Daily Pre-Use Safety Checks
Adapt this checklist to your site: edit, add, remove and reorder the checks, add your company name and logo, then save it as a PDF. Nothing is uploaded; your changes stay in this browser.
Your form
Inspection details (blank fields on the form)8 fields
The checklist · 35 checks · 5 sections
Sign-off (who signs the form)2 signers
FindRiskfindrisk.netGenerator Inspection Checklist: Daily Pre-Use Safety Checks
Inspection details
Placement and ventilation (engine stopped)
- 1.
The generator stands outdoors, not inside a building, garage, basement, crawl space or other enclosed spaceCritical
Open doors and windows may not stop carbon monoxide from building up.
Ref.: [7] [9] [10] [1]
PassFailN/A - 2.
The generator is not near doors, windows, vents or air intakes through which exhaust could enter occupied spacesCritical
Ref.: [7] [9]
PassFailN/A - 3.
There is 3 to 4 feet (about 0.9 to 1.2 m) of clear space on all sides of the generator and above it
This distance is from OSHA's fact sheet. Use the manufacturer's figure if it is larger.
Ref.: [7] [9]
PassFailN/A - 4.
The generator is dry and protected from rain; it does not stand in waterCritical
A canopy can keep rain off an open-frame set. It must not enclose the generator or block its ventilation.
Ref.: [7] [9] [10]
PassFailN/A - 5.
The generator stands on firm, level ground and is secured so that it cannot move, roll or tip
Brakes on or wheels chocked; trailer supports lowered.
Ref.: [1]
PassFailN/A - 6.
Fuel containers and other flammable materials are kept away from the generator and from any other source of heat or flame
Ref.: [7] [1]
PassFailN/A - 7.
The generator is as far from work areas and gathering places as practicable, or hearing protection is worn near it
Ref.: [7]
PassFailN/A
Engine and fuel (engine stopped)
- 8.
The frame, housing, mountings and lifting or towing points show no cracks, loose fixings or deformation
Ref.: [1] [9]
PassFailN/A - 9.
The fuel tank, cap and fuel lines are tight and do not leak; there is no spilled fuel on or under the generatorCritical
Fuel spilled on hot engine parts can ignite. Clean up any spill before starting.
Ref.: [9] [6] [7] [1]
PassFailN/A - 10.
Guards and covers over the fan, belt and other moving parts are in place, undamaged and firmly fixedCritical
Ref.: [1]
PassFailN/A - 11.
The exhaust and other hot parts are shielded or placed so that nobody can touch them by accident, and nothing combustible rests against them
A generator stays hot for a long time after it has stopped.
Ref.: [1] [7]
PassFailN/A - 12.
Engine oil, and coolant on liquid-cooled sets, are at the levels given in the manufacturer's manual
Check with the engine stopped and cool, as the manual describes.
Ref.: [1] [9]
PassFailN/A - 13.
The generator is refuelled only with the engine stopped and cooled downCritical
Fill the tank before the shift so that it does not have to be topped up while hot.
Ref.: [7] [6] [10]
PassFailN/A - 14.
Nobody smokes and there is no open flame where the generator is refuelled or fuel is kept
Ref.: [6] [7]
PassFailN/A - 15.
Fuel is kept and carried only in approved containers made for fuel and marked with their contents
Ref.: [6] [7]
PassFailN/A - 16.
A fire extinguisher suitable for fuel and electrical fires is close to the generator and the refuelling point
US construction rule for fuelling areas: rated at least 20-B:C and within 75 feet (about 23 m).
Ref.: [6] [1]
PassFailN/A
Earthing, protection and cables (engine stopped)
- 17.
The generator is earthed (grounded) as the manufacturer's instructions and the site's electrical design require; any earth conductor and rod connection is tight and undamagedCritical
OSHA lets the frame serve as the grounding electrode only when the generator supplies cord-and-plug equipment through its own receptacles and these are bonded to the frame. HSE says larger generators supplying a site should be earthed. If unsure, ask a competent electrician.
Ref.: [2] [8] [7] [10] [1]
PassFailN/A - 18.
The generator is not connected to the wiring of a building or cabin, unless through a transfer switch installed by a qualified electricianCritical
A direct connection can energise the supply network and electrocute people working on it.
Ref.: [7] [8]
PassFailN/A - 19.
The sockets or outgoing circuits in use are protected by an RCD (GFCI) where the rules for the site require itCritical
US construction: GFCI on 120 V single-phase 15 and 20 A receptacles, or an assured grounding program. HSE: RCD on each circuit where more than one earthed (Class I) item is supplied, and on the outgoing circuits of larger generators.
Ref.: [2] [10] [7]
PassFailN/A - 20.
No circuit breaker, fuse or RCD has been bypassed, bridged or disabledCritical
A device that keeps tripping points to a fault: have a competent person find it.
Ref.: [10] [7]
PassFailN/A - 21.
Sockets, switches and the control panel are undamaged and dry, their covers are in place, and no live part or burn mark can be seenCritical
Ref.: [1] [11] [10] [3]
PassFailN/A - 22.
Extension cables, plugs and connectors have no cuts, fraying, taped joints, cracked casings or bent or missing pinsCritical
The outer sheath should be gripped where it enters the plug: no coloured inner cores showing.
Ref.: [4] [5] [10] [11] [7]
PassFailN/A - 23.
Extension cables are flexible, have an earth (grounding) conductor, and are rated for the load and for outdoor or site use
US construction: three-wire cords designed for hard or extra-hard usage. HSE: twin and earth cable is not used as an extension cable.
Ref.: [3] [8] [7] [10]
PassFailN/A - 24.
Cables are run where vehicles, sharp edges and doors cannot damage them, they do not lie in water, and they do not cross walkways as a trip hazard
Ref.: [3] [4] [10]
PassFailN/A - 25.
The total connected load does not exceed the rated output on the generator's nameplate
Overloading leads to overheating, which can start a fire.
Ref.: [7]
PassFailN/A - 26.
The stop control, the emergency stop where fitted, and the main breaker can be seen, identified and reached
Ref.: [1]
PassFailN/A - 27.
The periodic control of the generator and of the earthing installation is in date, and the report is available
Türkiye: at least once a year unless a standard sets another period. A mobile generator used off the premises carries its last report with it.
Ref.: [1]
PassFailN/A
Running check (no load connected)
- 28.
The generator starts and runs without unusual noise, vibration, smoke or smellCritical
Switch off electrical equipment that smells strange or starts to smoke, and do not use it.
Ref.: [1] [7]
PassFailN/A - 29.
Where fitted, the voltage, frequency, oil pressure and temperature readings are in the manufacturer's normal range and no warning is showing
Ref.: [1]
PassFailN/A - 30.
No fuel, oil or coolant leaks while the engine runs, and exhaust gas escapes only from the exhaust outletCritical
Ref.: [1] [9]
PassFailN/A - 31.
Each RCD (GFCI) trips when its test button is pressed, and resetsCritical
HSE recommends this check daily. An RCD that does not trip is a failed critical check.
Ref.: [10] [8]
PassFailN/A - 32.
The stop control, and the emergency stop where fitted, stops the generatorCritical
Ref.: [1]
PassFailN/A
Result
- 33.
Every defect found has been recorded and reported to the supervisor
Ref.: [1] [11] [8]
YesNoN/A - 34.
If a critical check failed, the generator is stopped, its loads are disconnected and it is tagged "Do not use" until it has been repairedCritical
Ref.: [1] [5] [8] [10]
YesNoN/A - 35.
Notes and defects found
Note: ________
Critical check: if it fails, stop and correct it before work continues.
Sign-off
Operator
Supervisor
Legal basis and references
- [1] Türkiye: İş Ekipmanlarının Kullanımında Sağlık ve Güvenlik Şartları Yönetmeliği (Resmî Gazete, 25.04.2013) — Article 7 (periodic control); Annex I 2.3, 2.4, 2.6, 2.8, 2.10, 2.14, 2.17 to 2.19 (stopping, fixing, guards, hot parts, energy isolation, fire, electricity); Annex II 2.5 (combustion-engine mobile equipment only with sufficient air); Annex III 1.2, 1.3 to 1.3.2 (maintenance, operator check before each start of work, defective equipment out of use), 1.9, 2.3 and Table 3 (generator and earthing installation, 1 year).
- [2] United States: OSHA 29 CFR 1926.404, Wiring design and protection (construction) — (b)(1) ground-fault protection on construction sites and the exception for two-wire generators up to 5 kW; (f)(3) grounding of portable and vehicle-mounted generators. 29 CFR 1910.304(g)(3) has the same generator rule for general industry.
- [3] United States: OSHA 29 CFR 1926.405, Wiring methods, components, and equipment for general use (construction) — (a)(2)(ii)(I) flexible cords protected from damage; (a)(2)(ii)(J) three-wire extension cords for hard or extra-hard usage; (e)(2) and (j)(2)(ii) switches and receptacles in wet locations.
- [4] United States: OSHA 29 CFR 1926.416, General requirements (electrical safety-related work practices, construction) — (b)(2) walkways kept clear of cords; (e)(1) worn or frayed cords and cables not used.
- [5] United States: OSHA 29 CFR 1910.334, Use of equipment (electrical safety-related work practices) — (a)(2) visual inspection of cord- and plug-connected equipment and extension cords before use on any shift; defective items removed from service.
- [6] United States: OSHA 29 CFR 1926.152, Flammable liquids (construction) — (a)(1) approved containers; (f)(2) leakage and spillage; (g)(8) no smoking or open flames in fuelling areas; (g)(10) motors shut off during fuelling; (g)(11) fire extinguisher at fuelling areas.
- [7] United States: OSHA Fact Sheet, Using Portable Generators Safely (FS-3286) — Shock and backfeed, cords, GFCIs, grounding, keeping the generator dry, carbon monoxide and placement, refuelling and fuel storage, noise. Informational: it sets no new requirements.
- [8] United States: OSHA Fact Sheet, Grounding Requirements for Portable Generators — When the frame replaces a grounding electrode, transfer switches, cords with a grounding conductor, visual inspection before use and tagging defective equipment. Informational.
- [9] United States: OSHA Alert, Preventing Carbon Monoxide Poisoning While Working with Portable Generators (OSHA 4105, 2020) — Inspect for damage or loose fuel lines, keep dry, never indoors or near doors, windows and ventilation shafts, 3 to 4 feet of clear space.
- [10] United Kingdom: HSE, Electrical safety on construction sites, HSG141 (second edition, 2023) — Paragraphs 59, 62 to 64 (damaged equipment, cables, maintenance, RCDs never bypassed); 68, 70 and 71 (daily RCD test, user checks); 75 and 79 (IP rating, cable routes); 81 to 87 (generators: enclosed spaces, fuel, earthing, RCD protection). Guidance.
- [11] United Kingdom: HSE, Maintaining portable electrical equipment, HSG107 (third edition, 2013) — Paragraphs 38 and 39 (user checks on cables, plugs, sockets and extension leads; faults reported and equipment taken out of use). Used for the cables and connectors only; generators themselves are outside its scope.
Fill in this checklist on your phone. Scan to download FindRisk: run the checklist, add photos, score risks and share a PDF report in minutes.
This form was customized by its user from a FindRisk template. It is a guide and does not replace a risk assessment or the periodic inspection by a competent person.
Based on the template at: findrisk.net/checklists/generator-inspection-checklist/ · Version 1