Work activities
Excavation Inspection Checklist: Daily Trench Form
- Frequency
- Every shift
- Completed by
- Competent person
- Approved by
- Site manager
- The checklist
- 31 checks · 5 sections
An excavation inspection checklist is the form a competent person fills in before anyone goes into a trench or excavation: buried services, adjoining structures, soil and the protective system (sloping, shoring or a trench box), signs of a cave-in, spoil and plant near the edge, ladders and egress, air quality and water. If a critical check fails, everyone stays out until it is put right.
In the United States, OSHA 29 CFR 1926.651(k) requires a competent person to inspect excavations, the adjacent area and protective systems daily before work starts, as needed during the shift and after every rainstorm or other hazard-increasing event. In the UK, CDM 2015 regulation 22 requires an inspection at the start of each shift and after any event that may have affected stability. In Türkiye, the Construction Work OHS Regulation requires the excavation faces to be checked before each shift, after blasting, after unexpected falls of material, after damage to supports and after heavy rain, frost or snow, and work does not start until the excavation is found safe.
This form is for those routine inspections. It does not replace the design of the protective system, the utility locate or the excavation permit your site uses. For the full background, thresholds and common mistakes, see our excavation safety guide.
How to use this checklist
- Inspect before every shift, during the shift as conditions change, and again after rain, frost, snow, blasting, a fall of material or any damage to the supports.
- Fill in the header first: location, depth, width, soil type and the protective system in use, so the checks below can be judged against them.
- Walk the job from the outside in: services and surroundings, the edges and spoil, then the faces and protective system, then access, air and water.
- Mark each check Pass, Fail or N/A and photograph every defect, such as a crack along the edge or a damaged shoring member.
- If a critical check fails, get everyone out, stop entry and tell the supervisor; work restarts only after the fix and a new inspection.
- Sign the form and keep it with the site's inspection records for that excavation.
The checklist: Excavation Inspection Checklist: Daily Trench Form
Inspection details
Services and surroundings
- 1.
Buried services near the dig have been located and marked before diggingCritical
Check the utility drawings, the locate marks and any detector survey. In the US, the 811 call is made before digging.
PassFailN/A - 2.
Exposed pipes and cables are supported and protected while the excavation is openCritical
Ref.: [2]
PassFailN/A - 3.
Nearby buildings, walls and pavements show no new cracks or settlement, and are supported where the dig could affect themCritical
PassFailN/A - 4.
The excavation is fenced off or taped with warning signs so that the public and passers-by are kept out
Ref.: [1]
PassFailN/A - 5.
Where the dig is next to road traffic, workers wear high-visibility clothing
Ref.: [2]
PassFailN/A
Edges, spoil and plant
- 6.
Spoil, materials and equipment are kept back from the edge, or held by a retaining barrierCritical
OSHA: at least 2 ft (0.61 m) from the edge. The Turkish regulation gives no figure; set the distance for the soil and depth.
PassFailN/A - 7.PassFailN/A
- 8.PassFailN/A
- 9.
Where an operator cannot see the edge, stop blocks, barriers or a trained signaller are in useCritical
PassFailN/A - 10.PassFailN/A
- 11.
Walkways over the excavation are sound and have guardrails on both sides
Türkiye: at least 80 cm wide in built-up areas. OSHA: guardrails where the walkway is 6 ft (1.8 m) or more above the bottom.
PassFailN/A
Faces and cave-in protection
- 12.
The soil has been assessed by the competent person and the assessment still matches what is seen today
Re-assess when the soil changes, gets wet or is disturbed. OSHA Appendix A uses at least one visual and one manual test.
PassFailN/A - 13.
A protective system suited to the soil and depth is in place: sloping, benching, shoring or a trench boxCritical
OSHA allows none only in stable rock, or under 5 ft (1.52 m) where the competent person finds no sign of a cave-in.
PassFailN/A - 14.
Shoring or the trench box is installed as designed, with no missing or damaged membersCritical
Look for bent struts, loose wedges, cracked plates and hydraulic leaks. Damaged parts are checked by the competent person before reuse.
PassFailN/A - 15.
The trench box sits on or close to the bottom, and nobody is inside while it is movedCritical
OSHA: digging no more than 2 ft (0.61 m) below the box, only if it is rated for the full depth and no soil is lost from behind or below. Mark N/A if no box is used.
Ref.: [3]
PassFailN/A - 16.
Faces and edges show no cracks, bulging, slumping, sloughing or soil running from behind the supportsCritical
PassFailN/A - 17.
The bottom of the faces has not been undercutCritical
Ref.: [1]
PassFailN/A - 18.PassFailN/A
Access, air and water
- 19.
A ladder, stair or ramp is in place close to where people work in the trenchCritical
OSHA: in trenches 4 ft (1.22 m) or deeper, within 25 ft (7.62 m) of lateral travel. Portable ladders extend at least 3 ft (0.9 m) above the landing (OSHA 1926.1053).
PassFailN/A - 20.
Nobody climbs in or out on the shoring, struts or trench box
Ref.: [1]
PassFailN/A - 21.
Where bad air is possible, the atmosphere has been tested before entry and the result is safeCritical
For example near landfill, sewers, fuel or chemical storage. OSHA: test before entry where deeper than 4 ft; oxygen below 19.5 % is deficient. Mark N/A if no such risk.
PassFailN/A - 22.
No petrol or diesel engine runs in or next to the excavation unless the fumes are ducted away or the trench is ventilated
PassFailN/A - 23.
Dust is controlled, and work stops if harmful gas or silica dust is detected
Ref.: [1]
PassFailN/A - 24.
There is no standing or rising water in the excavation, or pumping is in place and watchedCritical
PassFailN/A - 25.PassFailN/A
- 26.
It is not raining, and the excavation has been re-inspected after any rain, frost or snowCritical
PassFailN/A - 27.
Workers know how to get out to a safe place in a cave-in, flooding or gas release, and rescue equipment is on hand where bad air is possible
PassFailN/A
Result
Critical check: if it fails, stop and correct it before work continues.
Sign-off
Competent person (inspector)
Site manager
Run this checklist on your phone
FindRisk turns inspections into a few taps: AI-generated checklists you can edit and save as templates, photo markup with AI hazard analysis, Fine-Kinney risk scoring and an instant PDF report.
Download FindRiskLegal basis and references
- [1] Türkiye: Yapı İşlerinde İş Sağlığı ve Güvenliği Yönetmeliği (Resmî Gazete, 05.10.2013, 28786) — Annex 4, B, Part II (excavation work) items 62–71; items 52 and 55 on signallers and plant near the pit.
- [2] United States: OSHA 29 CFR 1926.651, Specific excavation requirements — (b) underground installations; (c)(2) egress; (d) traffic; (e) loads; (f) warning system; (g) atmosphere and rescue; (h) water; (i) adjoining structures; (j) loose material and 2 ft spoil distance; (k) daily inspection; (l) walkways.
- [3] United States: OSHA 29 CFR 1926.652, Requirements for protective systems — (a)(1) cave-in protection and exceptions; (d) damaged materials; (g) shield systems.
- [4] United States: OSHA 29 CFR 1926 Subpart P, Appendix A, Soil Classification — Type A/B/C classification by a competent person; visual and manual tests; reclassification when conditions change.
- [5] United Kingdom: The Construction (Design and Management) Regulations 2015, regulation 22 (Excavations) — (1)–(3) collapse, falls into and overloading of excavations; (4)–(5) inspection by a competent person and no work until remedied.
- [6] United Kingdom: HSE, Excavations (construction safety topic) — Edge barriers, plant away from the sides, engine fumes, underground services (HSG47).
Version 1 · Updated November 19, 2026 · findrisk.net/checklists/excavation-trench-inspection-checklist/
Fill in this checklist on your phone. Scan to download FindRisk: run the checklist, add photos, score risks and share a PDF report in minutes.
Version 1 · Updated November 19, 2026 · findrisk.net/checklists/excavation-trench-inspection-checklist/
Frequently asked questions
How often does an excavation need to be inspected?
OSHA 1926.651(k) requires a daily inspection before work starts, more as needed during the shift, and another after every rainstorm or other event that increases the hazard. CDM 2015 regulation 22 requires one at the start of each shift and after any event likely to affect stability. The Turkish Construction Work OHS Regulation lists before each shift, after blasting, after unexpected falls of material, after support damage and after heavy rain, frost or snow.
Who is allowed to inspect a trench?
A competent person. OSHA 1926.650 defines this as someone who can identify existing and predictable hazards and is authorised to take prompt corrective measures to eliminate them. In Türkiye, excavation work is supervised by a competent person (ehil kişi) appointed by the employer.
When does a trench need a ladder?
Under OSHA 1926.651(c)(2), trenches 4 feet (1.22 m) or deeper need a stairway, ladder, ramp or other safe way out within 25 feet (7.62 m) of lateral travel. The Turkish regulation sets no depth figure; it requires suitable and safe means of access and forbids climbing on supports and struts.
How far must spoil be kept from the edge of a trench?
OSHA 1926.651(j)(2) requires materials and equipment to be kept at least 2 feet (0.61 m) from the edge, or held back by retaining devices. The Turkish regulation requires a sufficient distance, a barrier where spoil could slide back, and a safety distance for vehicles, without giving a number, so set the distance for your soil and depth.
Does a trench less than 5 feet deep need cave-in protection?
Not automatically. OSHA 1926.652(a)(1) exempts excavations under 5 feet (1.52 m) only when a competent person examines the ground and finds no sign of a potential cave-in, and excavations made entirely in stable rock. Shallow trenches still need the daily inspection.
