Overhead Crane Inspection Checklist: Daily Pre-Shift Checks

Frequency
Every shift
Completed by
Crane operator
Approved by
Maintenance or production supervisor
The checklist
35 checks · 5 sections

An overhead crane inspection checklist is the check the assigned operator completes at the start of each shift, before the first lift: the rated load marking and reports, a visual check of the hook, hoist rope or chain and the visible structure, function tests of the controls, brakes and upper limit switch with no load, and the load path. If a critical check fails, the crane is tagged out of service until the defect has been corrected.

In the United States, OSHA 29 CFR 1910.179 classes inspections as frequent (daily to monthly) and periodic (1 to 12 months). It requires a daily visual check of hooks and hoist chains, and a test of the upper limit switch at the start of each operator's shift. In Türkiye, the Work Equipment Regulation lists bridge cranes in Annex III for periodic inspection by an authorised person, yearly unless the standards set another interval, and requires the maximum load to be marked on the crane.

This form does not replace the periodic inspection, the monthly rope inspection OSHA requires, or the planning of each lift. For the rest of the plant, see our manufacturing safety inspection checklist.

How to use this checklist

  1. Complete the form at the start of every shift, before the first lift, and again when a new operator takes over the crane.
  2. Do the document and visual checks with the crane parked and the hook within view, then the function tests with no load on the hook.
  3. Mark each check Pass, Fail or N/A (for example chain items on a rope hoist or pendant items on a cab-operated crane), and photograph every failed item.
  4. If a critical check fails, do not lift: tag the crane out of service, tell the appointed person at once and report the defect in writing.
  5. Keep the signed form with the crane's records so the next operator can read it before starting.

The checklist: Overhead Crane Inspection Checklist: Daily Pre-Shift Checks

Inspection details

Site / work location: 
Crane ID or serial number: 
Crane type: 
Control type: 
Rated load (t): 
Shift: 
Date and time: 

Documents and handover

  1. 1.

    The rated load is plainly marked on the crane and on each hoist, and can be read from the floorCritical

    Ref.: [1] [2]

    PassFailN/A
  2. 2.

    The latest periodic inspection report is available and has not expiredCritical

    Türkiye: report by an authorised person, yearly unless the standards set another interval. US: periodic inspection at 1- to 12-month intervals.

    Ref.: [2] [1]

    PassFailN/A
  3. 3.

    The previous shift's form has been read, and every defect it reported has been corrected

    Ref.: [1]

    PassFailN/A
  4. 4.

    The operator has been assigned by the employer to operate this craneCritical

    Ref.: [1] [2]

    PassFailN/A
  5. 5.

    If the crane has been out of use for a month or more, it was inspected before returning to serviceCritical

    US: idle 1–6 months needs the frequent and rope inspections; over 6 months also the periodic inspection. Türkiye: authorised-person checks after long periods out of use. Mark N/A for a crane in regular use.

    Ref.: [1] [2]

    PassFailN/A

Visual checks (crane parked)

  1. 6.

    No repair is in progress on the crane or runway, and no lock, warning or out-of-order sign is on itCritical

    Locks and signs are removed only by the people who fitted them, once the work has finished.

    Ref.: [1] [2]

    PassFailN/A
  2. 7.

    The hook has no cracks, deformation or twistCritical

    OSHA 1910.179 lists for discard hooks with cracks, a throat opening more than 15% above normal, or more than 10° of twist from the plane of the unbent hook.

    Ref.: [1]

    PassFailN/A
  3. 8.

    Where a safety latch is fitted, it closes the hook openingCritical

    Good practice to stop a sling slipping off; follow the manufacturer's recommendations. Mark N/A if no latch is fitted.

    Ref.: [1] [2]

    PassFailN/A
  4. 9.

    The hoist rope shows no kinks, crushing, unstranding, broken wires or corrosionCritical

    A daily look from the floor. OSHA also requires a thorough inspection of all running ropes at least monthly, with a record. Mark N/A for chain hoists.

    Ref.: [1]

    PassFailN/A
  5. 10.

    Hoist chains and end connections show no excessive wear, twist, distorted links or stretchCritical

    Mark N/A for rope hoists.

    Ref.: [1]

    PassFailN/A
  6. 11.

    The rope is reeved as the manufacturer specifies, and the parts of the rope are not twisted around each otherCritical

    Ref.: [1]

    PassFailN/A
  7. 12.

    Air and hydraulic lines, tanks and valves show no deterioration or leaksCritical

    Mark N/A for a fully electric crane with no such lines.

    Ref.: [1]

    PassFailN/A
  8. 13.

    The load block and the sheaves you can see have no cracks or obvious wearCritical

    Ref.: [1]

    PassFailN/A
  9. 14.

    Girders and other parts visible from the floor have no deformation, cracks, corrosion or loose boltsCritical

    Anything you can see from the floor; close inspection belongs to the periodic inspection.

    Ref.: [1]

    PassFailN/A
  10. 15.

    Trolley stops and bridge and trolley bumpers you can see are in place and undamagedCritical

    Ref.: [1]

    PassFailN/A
  11. 16.

    The pendant station is clean and undamaged, and each function is clearly labelled

    Mark N/A on cab-operated cranes.

    Ref.: [1]

    PassFailN/A
  12. 17.

    Ladders, stairs and footwalks to the cab or bridge are clear and undamaged

    Mark N/A where no one needs to climb to the crane.

    Ref.: [1]

    PassFailN/A

Function tests (power on, no load)

  1. 18.

    The runway disconnect can be reached from the floor and can be locked in the open position

    Ref.: [1] [2]

    PassFailN/A
  2. 19.

    Pendant buttons and rope controls return to off as soon as they are releasedCritical

    Mark N/A on cab-operated cranes.

    Ref.: [1]

    PassFailN/A
  3. 20.

    The emergency stop stops all crane motionsCritical

    Mark N/A if the crane has no emergency stop.

    Ref.: [2] [1]

    PassFailN/A
  4. 21.

    The gong or other warning signal works and can be heard on the floorCritical

    OSHA requires one except on floor-operated cranes. Mark N/A if none is fitted on a floor-operated crane.

    Ref.: [1] [2]

    PassFailN/A
  5. 22.

    The hoist raises, lowers and stops the empty hook smoothly in response to the controlsCritical

    Listen for unusual noise and watch for jerking, which can point to maladjustment or wear.

    Ref.: [1]

    PassFailN/A
  6. 23.

    When the control is released, the hoist brake holds the empty hook without it creeping downCritical

    Ref.: [1]

    PassFailN/A
  7. 24.

    The upper limit switch stops the block when tested with no load at slow speedCritical

    Inch the block into the limit or run it slowly. If it fails, tell the appointed person immediately. Never use this switch as an operating control.

    Ref.: [1]

    PassFailN/A
  8. 25.

    The bridge travels smoothly in both directions, without jerking or unusual noiseCritical

    Ref.: [1]

    PassFailN/A
  9. 26.

    The trolley travels smoothly in both directions, without jerking or unusual noiseCritical

    Ref.: [1]

    PassFailN/A
  10. 27.

    Bridge and trolley brakes stop the motion without unusual driftCritical

    Mark N/A where these motions have no brake fitted.

    Ref.: [1]

    PassFailN/A

Before the first lift

  1. 28.

    The loads planned for this shift are within the crane's rated loadCritical

    Ref.: [1] [2]

    PassFailN/A
  2. 29.

    Slings and other lifting accessories are suitable for the load, marked and undamagedCritical

    Slings and accessories also need their own inspection under your procedures.

    Ref.: [2] [1]

    PassFailN/A
  3. 30.

    The load path is clear of obstructions, no one is on the load or hook, and loads will not pass over peopleCritical

    Ref.: [1] [2]

    PassFailN/A
  4. 31.

    Where the operator cannot see the whole load path, a trained signaller is assignedCritical

    Mark N/A where the operator sees the whole load path.

    Ref.: [2]

    PassFailN/A
  5. 32.

    Where cranes share a runway or their work areas overlap, measures to prevent collisions are in placeCritical

    Mark N/A for a single crane with no overlapping work area.

    Ref.: [2] [1]

    PassFailN/A

Result

  1. 33.

    Every defect found has been reported in writing to the supervisor and the next operator

    Ref.: [1]

    YesNoN/A
  2. 34.

    If a critical check failed, the crane is tagged out of service and will not be used until correctedCritical

    Ref.: [1]

    YesNoN/A
  3. 35.

    Notes and defects found

    Note: ________

Critical check: if it fails, stop and correct it before work continues.

Sign-off

Operator

Name: 
Signature: 
Date: 

Supervisor

Name: 
Signature: 
Date: 

Run this checklist on your phone

FindRisk turns inspections into a few taps: AI-generated checklists you can edit and save as templates, photo markup with AI hazard analysis, Fine-Kinney risk scoring and an instant PDF report.

Download FindRisk

Legal basis and references

  1. [1] United States: OSHA 29 CFR 1910.179, Overhead and gantry cranes — (b)(5), (b)(8): marking, designated operators; (c)–(g), (i): access, stops, brakes, controls, disconnect, warning signal; (j): frequent, periodic and idle-crane inspections; (l): repairs; (m): ropes; (n): handling the load, upper limit switch test.
  2. [2] Türkiye: İş Ekipmanlarının Kullanımında Sağlık ve Güvenlik Şartları Yönetmeliği (Resmî Gazete, 25.04.2013) — Art. 7 and Annex III: periodic inspection of bridge cranes, records; Art. 8: assigned users; Annex I 2.3, 2.4, 2.11, 2.13, 3.2.2, 3.2.3: stopping, emergency stop, warnings, maintenance with energy off, load markings, unintended release; Annex II 3.1.3, 3.1.4, 3.2.1, 3.2.3: people under loads, accessories, collisions, signaller.

Version 1 · Updated November 10, 2026 · findrisk.net/checklists/overhead-crane-inspection-checklist/

Frequently asked questions

How often does an overhead crane need to be inspected?

OSHA 1910.179(j) sets frequent inspections at daily to monthly intervals and periodic inspections at 1 to 12 months, depending on the item and the crane's use. Running ropes need a thorough inspection at least monthly. In Türkiye, Annex III of the Work Equipment Regulation requires a periodic inspection by an authorised person, yearly unless the standards set another interval, and also after events such as an accident or a long period out of use.

What is the difference between frequent and periodic crane inspections?

Under OSHA 1910.179(j)(2), frequent inspections cover operating mechanisms, air and hydraulic lines, hooks, hoist chains and rope reeving. Periodic inspections under (j)(3) go deeper into the structure, bolts, sheaves, drums, brake wear, indicators and electrical apparatus. This form covers the start-of-shift part and records anything visible from the operator's position.

Is a written daily crane inspection record required?

OSHA 1910.179 ties the certification record to the monthly inspections of hooks, hoist chains and ropes, with the date, the inspector's signature and an identifier. It does not state a daily record in those paragraphs. Keeping this form is still good practice, because it shows the next operator what was found. In Türkiye, Article 7 of the Work Equipment Regulation requires periodic inspection results to be recorded and kept.

When must a crane hook be taken out of service?

OSHA 1910.179(j)(2)(iii) lists hooks with cracks, a throat opening more than 15 percent above normal, or more than 10 degrees of twist from the plane of the unbent hook. Under (l)(3)(iii)(a) these hooks are discarded. Welding or reshaping is generally not recommended and, if attempted, needs competent supervision and a load test before further use.

Can the upper limit switch be used to stop the hook?

No. OSHA 1910.179(n)(4)(ii) says the hoist limit switch that controls the upper limit of travel must never be used as an operating control. It is a safety device: test it at the start of each shift with no load, inching the block or running it slowly, and tell the appointed person immediately if it fails.